Flessione, Di Saldatura, Decoiling, Di Taglio, Punzonatura
Product name
Prefabricated Steel Truss Bridge
Application Fields
Footbridge,Pedestrian bridge etc
Surface treatment
Anti-rust Painting
Main frame
Steel Structure
Material
Q235/Q235B/Q355/Q355B
Purlin
C-section
Drawing design
AutoCAD
Certificate
ISO9001:2008/ISO14001:2004
Installation
Engineers Guidance
Life span
50Years
Imballaggio e consegna
Pacchetto
Prefabricated Steel Structure Box Girder Bridge Steel Truss Frame Beam Bridge Construction Main steel frame without packing load in 40'OT; Roof and wall panel load in 40'HQ. Or as required.